Wind farms

Development, construction, operation and maintenance

Bester not only carries out wind farms under the EPC modality, but also promotes licenses and provides knowledge acquired by its personnel thanks to their intervention in both Engineering and Execution in wind projects prior to the company's founding.

Its flagship project was executed in Cerna, Romania: Cerna Wind Park, with a total capacity of 17.5 MW. Bester acted as prime contractor for civil works, as well as delivery and installation of turbines (wind turbines).

The company would like to continue betting on the wind resource, so it is studying the possibility of developing and building wind farms in countries that need to meet their energy needs and increase the use of renewable energy, as well as in countries classified as highly sustainable because of their clean technologies and moderate wealth.

In Spain, the month of December 2017 was the second month of December with more wind generation in history, only surpassed by December 2012 and doubling its power generation compared to the same month of 2016. It was the first generation technology covering the 24.3% of demand in Spain, allowing consumers to save more than 400 million euros.

In the whole of 2017, wind power has been the second technology of the Spanish energy system, with a total of 23 gigawatts (GW) installed, producing more than 47 terawatt hour (TWh), which has been 19.2% of the electricity consumed domestically in the year.

About Bester

Conoce BESTER

BESTER ECOLOGY

Blog

Use of cookies

This web site uses cookies so that you have the best user experience. If you continue browsing you are giving your consent for the acceptance of the aforementioned cookies and the acceptance of our cookies policyClick the link for more information.plugin cookies

OK